Subscribe to our free weekly newsletter and stay ahead with the latest news in education construction

Kawneer systems meet the need for new and old

Glazing systems from Kawneer feature on a new-build and refurbished school

Posted by Stephanie Broad | August 27, 2015 | Supplier News

Key elements from the glazing systems portfolio of leading architectural aluminium supplier Kawneer feature on the new-build and refurbishment aspects of a secondary school’s £29million redevelopment. 

Kawneer’s 50mm wide AA®100 zone-drained horizontally-capped and mullion-drained structurally glazed curtain walling, AA®543 tilturn windows, and medium-duty swing and series 190 heavy-duty welded doors were installed by approved specialist sub-contractor Leay on the John Roan School in the Royal London Borough of Greenwich. 

Funded by the BSF (Building Schools for the Future) programme, the existing John Roan School of 1,400 pupils was extended to 12,700m2 across a split-site campus comprising the Westcombe Park new-build and Maze Hill refurbishment. 

The Westcombe Park building totals a 7,600m2 flexible, transformational learning environment for the middle years nine, 10 and 11. Accommodation includes a sports and amenity building, which can be operated independently for the community. 

Generally arranged over three storeys, a large, double-height entrance area connects the main education block and sports block. This level also accommodates classrooms, a central dining space at the heart of the school, design and technology labs, music and drama rooms, offices, drama and activities studios and DSP facilities. 

The area between the two parallel flights of main stairs in the entrance foyer features stepped seating for informal gatherings, break-out and performance. 

The first floor provides further classrooms at the perimeter, open-plan ICT break-out areas at either end of an atrium void, staff bases, sports hall and changing facilities. Science labs, prep room and classrooms are located on the second floor alongside an open learning resource centre, other staff and office accommodation, and a winter garden. 

Also designed by architects John McAslan + Partners, the £8.6million refurbishment of the Maze Hill building proved more complex, it being a Grade ll listed Victorian building within a Conservation Area and the Greenwich Park World Heritage Site. There were also a number of listed items within the two-storey building, including a staircase, ornate stonework and a clock tower. 

Work to the solid brick construction originally built in 1927 required sensitive restoration work in addition to sympathetic extension plans. Original Crittal windows and face brick required a full overhaul and new materials were selected in conjunction with the client’s key satisfaction criteria, Grade ll listing requirements, and the cost budget. 

Other works included demolition of the rear elevation and courtyard areas of the main building, rebuilding of the rear elevations and refurbishment of all other areas, including covering one courtyard with an ETFE roof. 

This project also involved the integration of new doors and windows into the existing building as well as the upgrading of existing hard and soft landscaping areas. 

Throughout the works the existing school remained in operation, requiring work-around solutions for peak school term periods such as GCSE and A-level exams. Works by main contractor Wates Construction were divided into six phases to allow the school to function continuously. 

www.kawneer.co.uk    

Subscribe to our free weekly newsletter and stay ahead with the latest news in education construction

Related stories

Cutting-edge glazing for Materials Innovation Factory

Design for dementia 

Time to invest: efficient heating solutions for schools

Space to live and learn

SEM analysis plays key role in school asbestos assessments

Schoolhaus celebrates triple-award haul for energy efficiency

HOK to Design New Kuwait University Campus buildings

Fit for purpose

Twelve priority schools complete in north-west

New CofE academy opens near Swindon

Market place - view all

S&C Slatter

S&C Slatter have over 20 years experience as specialists in constru...

Meru networks

Meru began with a vision that sooner rather than later most enterpr...

ViewSonic

ViewSonic® Corporation, headquartered in Walnut, California, is...

The Brookwood Partnership

Brookwood Partnership is the only owner operated contract catering ...

Sports facilities

Sports Facility Services Limited was set up in June 2013 with the ...

Gerflor

Gerflor is a group that creates, manufactures and markets innovativ...