Subscribe to our free weekly newsletter and stay ahead with the latest news in education construction

Keston Boilers score top marks at Lancing College

New boilers improve heating system at boarding accommodation as part of Lancing College refurbishment programme

Posted by Stephanie Broad | August 15, 2015 | HVAC & lighting

Lancing College is an independent boarding and day school, providing education for boys and girls aged 13-18 years. Three new boilers have been installed in Gibbs House, an accommodation block providing boarding facilities for 70 boys, to improve heating and running costs. Like all the buildings at Lancing College, Gibbs House is over 170 years old and the old heating system had previously been served by a central boiler room located in the main building over 50 metres away.

The new Heat Only Boilers were installed on Keston’s Frame and Header Kit, which was delivered in prefabricated modules and assembled on site. The system was installed in a new plant room within the building, eradicating the need for a long pipe run, and serves 60 radiators. Around 200 yards of new 67mm copper piping runs along four foot high tunnels located throughout the building, ensuring they are out of sight and retain the character of the school.

There are around 30 Keston boilers installed throughout Lancing College and this installation was the first that utilised the new range of Keston boilers, which were launched in 2013. Chris Smith commented: “The Keston Heat Only boilers were very straightforward to install, especially with the Frame and Header kit as supplied by Keston. They have been running perfectly since their installation and the increased energy efficiency has meant a large reduction in running costs for the school.

“The flexible flueing options offered by Keston twin flue boilers were perfect for our needs, as they allow us to hide the flues so they do not affect the character of the buildings by emerging from the original flintwork.”

www.keston.co.uk    

Subscribe to our free weekly newsletter and stay ahead with the latest news in education construction

Related stories

Preparing for the switch on

Stafford College unveils new science building

Don't get caught out by ErP

Stainless steel or aluminium?

University of York's central hall to be refurbished

UK schools are unprepared for heating system failure

£700K refurb for Cambridge College

Why schools need Low Surface Temperature Radiators

Lewisham Southwark College gets a £40m redevelopment

Donhead Preparatory School transformed by new refurbishment

Market place - view all

Red sky

We’re the UK’s leading independent solar installer, hel...

Britcab

Need a portable cabin or modular building?

We sell and hire ...

Interface

Interface is a global leader in the design and manufacture of susta...

Fire Protection Association

The Fire Protection Association (FPA) is the UK's national fire saf...

ViewSonic

ViewSonic® Corporation, headquartered in Walnut, California, is...

Sodexo

Our positioning in the services industry is original and unique. It...